国产亚洲精品a在线观看app-国产亚洲精品a在线看-国产亚洲精品va片在线播放-国产亚洲精品va在线-国产亚洲精品yxsp-国产亚洲精品成

中文版| English

Welcome to Shandong Yasheng Heavy Industry Co., Ltd. Official Website!
Home
Overview

Shandong Yasheng Heavy Industry Co., Ltd. was founded in 1990, is a scientific research. Development, manufacturing in one of the special machinery and large-scale...

about3.png
News
Products
Technology
Cases
Recruitment
Contact
Message

Announcement

Your current location:Home>Products > CQ130-60 type of cast-in-place lining machine
CQ130-60 type of cast-in-place lining machine
 
 

First, the introduction of cast-in-place lining machine

    CQ130-60 cast-in-place channel lining machine is our company engineering and technical personnel according to market needs, play mechanism of concrete molding technology research accumulated more than 40 years of successful experience, is simple construction, easy operation, high production efficiency, low labor intensity , The equipment structure is scientific and reasonable, full-featured, stable performance, high degree of automation for the target design and development of the leading areas of the new generation of channel lining machine. The use of CQ130-60 cast-in-place channel lining machine construction site pouring U-shaped, ladder, rectangular impermeable channel without the traditional construction method of the template investment and template installation removal and handling a large number of materials, can reduce construction costs by 50%.

Second, the drainage bed construction methods

1, in accordance with the slope to determine the slope of the bed and the height of the basis of stratified rolling, so that the soil density of not less than 1600Kg / m3;

2, set the channel centerline to the center line to both sides in accordance with the channel width of the release of both sides;

3, according to the size of the line and the slope of the slope than the excavation of the earth, not greater than the standard section, do not dig backfill, slightly less than the standard section is appropriate (the machine has a bed of bed repair function).

Third, the use of lining machine

1, in the shape of the channel along the bottom of the slope in accordance with the height of the slope and the lining of the laying wheel laying wheel guide rails;

2, check the lining of the various parts and screws are tightened, the lining machine laying a good guide rails, so that the lining of the guide mode, vibration mode and sliding mode and soil in the same center line;

3, connecting the wire rope and traction hook, and the rope rope pulley hook placed 30m at the top of the lining machine is fixed, put the wire rope, you must first put the clutch in a separate state, put the rope after the clutch back to the original position;

4, no load test: start the vibrator and hoist, in the case of no load to check whether the normal work of the machine, if no exception, can be prepared on the lining;

5, concrete mixing water-cement ratio to 0.44-0.48 is appropriate, aggregate particle size is not greater than the wall thickness of 1/4, gravel ratio is not greater than 44% of the stone, can add no more than 25% of cement content of coal Gray to improve the mobility of concrete, to promote the transaction, to achieve external light real. Specific according to the label and according to soil and weather and other factors;

6, lining, the filler to the silo of 2/3, the first open vibration, and then open the hoist to walk, while walking along the packing vibration, with the artificial face;

7, according to the channel level, every 4-6 meters set expansion joints together, in the lining after the concrete in the condensation before the use of portable cutting expansion joints;

8, on the shape of the concrete channel coating conservation.

 

Copyright ©Copyright (C) Shandong Yasheng Heavy Industry Co., Ltd. All rights reserved. 2002-2018 ICP: 08000463; 魯ICP備10022443號(hào)-6

Address: Gaomi City, Shandong Province, Yi'an Road, Middle Road, No. 4399 (Gaomi City, high-speed intersection 5 km south of the road east) 

National free hotline: 400-050-9488 (machine)  400-649-6388 (water machinery)   Fax: 0536-2334888

Technical support: enterprise network

技術(shù)支持



主站蜘蛛池模板: 91国产高清福利院 | 日韩av在线一区二 | 果冻传媒91制片潘甜甜七夕喜剧 | 91精品国产综合久久久蜜臀粉嫩 | 91av视频精品一区二区三区 | 91女神视频| 午夜无码大尺度福利视频 | av免费啪啪专区 | 一区二区三区免费视频播放器 | 丰满多水的寡妇 | 日韩av午夜免费观看 | 91一区二区三区在线 | WWW亚洲精品久久久乳 | 成年午夜免费aⅴ在线观看 成年性生交大片免费看 | 国产av一区二区精品久 | 波多野结衣爱爱视频 | 91久久香蕉囯产熟女线看 | 国产a级三级三级 | 99久久免费国产香蕉麻豆 | 成AV人片一区二区三区久久 | 91在线无码精品秘蜜桃 | 91精品人妻一区二区三区蜜 | 午夜男女爽爽影院在线 | 91精品久久久久久久久入口 | 日韩av无码成人无码免费 | 91青草国产超碰人人 | 99精品国产自在现线10页 | 国产v亚洲v天堂无码流 | 韩国无码无遮挡在线观看 | 99久久精品免费网站 | 91精品手机| 果冻传媒精品推荐在线观看 | 1024精品视频在线观看 | 91po国产在线精品免费 | 高清成人av在线不卡 | 粉嫩无码国产在线观看 | 99久久午夜精品一区二区 | 日韩av在线乱看 | 91精品在线播放 | 一区二区精品 | 99久久久无码国产精品试看 |